
BRONKHORSTHIGH‐TECH
9.17.051 MASS‐VIEW®series Page3
Short‐formOperationInstruction
BeforeinstallingtheMASS‐VIEW®itisimportanttobe
surewhetheryoureceivedtherightmodelusingthe
packinglistandtheattachedlabelontheinstrument.
Besurethepipingsystemisclean.Forabsolute
cleanlinessalwaysinstallfilterstoassureamoistureand
oil‐freegasstream.InstalltheMASS‐VIEW®accordingto
thedirectionoftheflowarrowonthelabelattheback
oftheinstrument.
Installtheinstrumentinthelineandtightenthefittings
accordingtotheinstructionsofthesupplierofthe
fittings.
Besurethesystemhasnoleaksbeforeapplyinggas
pressure.
Electricalconnectionsmustbemadewithastandard
cableoraccordingtothehook‐updiagraminthis
manual.
Whentheinstrumentispoweredupthefirsttime,a
setupmenuappearswherethepre‐installedgascanbe
selected,whichflowrangeistobeusedandwhich
communicationtype.
Usethe4‐waybutton(upanddowndirection)for
navigationandpressthecentreofthebuttontoselect.
Applypowertotheinstrumentandallowapprox.30
minutesforwarm‐upandstabilization.Thismaybedone
withorwithoutgaspressureappliedtothesystem.
Afterenteringthedefaultpassword(whichis‘abc’)in
thesecuritymenu,allmenuscanbeenabledordisabled.
Alsoanewpasswordcanbeenteredandsaved.
Performzeroactionifneeded.Seeinstructionsatsection
3.6zeroingprocedureinthismanual.
Yourinstrumentisnowreadyforoperation.
Commentaires sur ces manuels